Services
Code of Practice
- Key requirements
- Recommendations
-
Step 01
Waste arrives at waste transfer station
Key requirementsAppropriate planning permissions
Suitable permit under the permitting regulations
Compliance with DoC
RecommendationsContract with onward receiving plant
-
Step 02
Pre-treatment of waste station
Key requirementsAppropriate permit
Waste accurately described in line with DoC
RecommendationsPre-treated to meet requirements and specifications of Off-taker
-
Step 03
Preparation for transport
Key requirementsEnsure compliance with DoC
RecommendationsWrapped or containerised to reduce potential for nuisance and odour
Pre-treated to enable suitable recovery by Off-taker
-
Step 04
Storage
Key requirementsAppropriate permit in place for storage
Storage must not breach permit conditions
Compliant and robust FPP in place
RecommendationsCumulative storage times should be monitored throughout the Supply Chain
An assessment should be made of the proximity of animal feedstuffs or food also in storage
-
Step 05
Transportation
Key requirementsTransported in line with DoC
Transported by registered carrier
Carriers must hold all relevant Vehicle licences
RecommendationsContract with onward receiving plant
-
Step 06
Loading
RecommendationsWaste acceptance procedure carried out
Care should be taken when loading to prevent loss of waste to the environment
Comprehensive risk assessment
Contingency arrangement in place
-
Step 07
Export
Key requirementsUndertaken in line with TFS Regulations, UN Basel Convention, OECD Decision and EU Waste Shipment Regulations
RecommendationsDue diligence should be undertaken on hauliers
-
Step 08
Unloading
Key requirementsConducted in accordance with requirements of receiving country
RecommendationsCare should be taken when unloading to prevent loss of waste to the environment
Comprehensive risk assessment
-
Step 09
Transportation
Key requirementsTransported in line with legislation of receiving country
RecommendationsPrevent loss of waste to the environment
-
Step 10
Further pre-treatment
Key requirementsIf desired for an interim operation, the Exporter must provide details on the notification document
An Exporter must complete an interim movement form before the waste may be moved
-
Step 11
Received at recovery facility
Key requirementsMovement document sent within three working days of receipt of SRF
Recovered within one year, or sooner if stipulated by relevant regulator
Recovery certification must be issued once treated